- 50 -
Wheel to axle xx
Axle to undercarriage frame xx
Towbar to undercarriage frame xx
Towing eye to towbar xx
Undercarriage frame to box B frame xx
Generators in stand-by application have to be tested on a regular basis. At least once a
month the engine should run for one hour. If possible a high load (> 30%) should be
applied so that the engine reaches its operating temperature.
Maintenance schedule Daily
50 hrs
after initial
start-up
Every 500
hours
Every 1000
hours
Every 2000
hours
Yearly
Service pak - - 2912 4546 05 1636 3103 37 1636 3103 38 -