Appendix B: Avid S3 Dock Link Kit
If you are using the Dock along with an S3, you can use the Avid S3 Dock Link kit (not included) to attach them to each other. The
Link kit lets you attach the Dock to the left or right of S3 to keep them stable and aligned. You can install the Link Kit at any time.
Installing the S3 Dock Link Kit
The following sections explain each of the steps required to install the Link Kit. The examples show an S3, but installation for S1
is similar.
Collecting the Required Items
Getting Started
Installing the Spacer Plates
Attaching the Foot Bracket
Installing the Link Plate
Attaching the Dock to the S3
Collecting the Required Items
Installing the Link Kit requires the following additional items that are not included in the kit:
#1 Phillips screwdriver.
A padded surface large enough to be able to place the S3 face down.
Two blocks to set the S3 on during installation. Both blocks should be at least 1-inch wide, 1-inch tall, and 8-inches long.
Getting Started
To begin, unpack the contents of the Link Kit and then prepare the S3 for installation.
To get started installing the Link Kit:
1 Decide how you want to arrange your Dock and S3 (Dock to the left of S3, or to the right of S3).
2 Unpack the Avid S3 Dock Link bracket and other components, shown in the following figure.
In the following table, numbers refer to the figure, above.
If you are using one or more S1s with the Dock you can use the S1 Link plate included with each S1. For more information, see
the Avid S1 Guide.pdf.
Figure 1. Link Plate, Spacer Plates, and Foot Bracket