EasyManua.ls Logo

bar SmartControl 2.0 - Mounting with Buslifts;Vanlifts

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation manual
Bär SmartControl 2.0
40000001186_EN_03.docx Page 18 / 39 Date: 31/03/2020
4.1.3 Mounting with Buslifts/Vanlifts
1. Slide the receiver into the holder Mat. no. 200008990 until the cable of the receiver reaches the strain
relief.
2. Attach the cable to the strain relief using a cable tie.
3. Attach the SmartControl 2.0 receiver holder EVO mat. no. 200008990 to the flange console using two
hexagon screws M4x14 Mat. no. 200002987 and washers Mat. no. 101100738 on the side facing
away from the road.
4. Route the supply cable of the receiver with the other lines or lead it to the power pack box along the
cross beam between the flange consoles.
5. Disconnect the Molex contacts from the housing.
6. Insert the receiver cable into the power pack case.
7. Connect the Molex contacts again in accordance with the circuit diagram and then re-connect the
cable to the CAN2 port of the eBC Controller Pro.
Receiver
Holder
Strain relief
Cable tie

Table of Contents