EasyManua.ls Logo

Baur Sys compact 2000 M pro - Page 95

Baur Sys compact 2000 M pro
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Syscompact 2000 M pro Index
822-175-2 95 / 98
Removing the IRG 2000 from the
system • 42
Replacing the rechargeable batteries
of the IRG 2000 • 85
S
Safety devices • 25
Safety instructions for cable fault
location • 52
Safety instructions for cable testing
50
Safety instructions for connecting the
IRG 2000 to the live cable • 37
Safety instructions for connecting the
system • 35
Safety instructions for
decommissioning 75
Safety instructions for maintenance
work • 79
Safety instructions for repair work 87
Safety instructions for the system’s
surge mode • 73
Safety locking feature against
unauthorised operation • 16
Saving measurement data • 45, 59,
63, 71
Screened cable with 1 phase • 36, 38
Screened cable with 3 phases • 36,
38
Securing the test area • 39
Selecting the language 43, 46
Selecting the system of units • 44
Setting cursors • 44
Setting ICM parameters • 66
Setting parameters for the acoustic
pin-pointing • 72
Setting SIM/MIM parameters • 60
Setting TDR parameters • 54
Setting the brightness of the indicator
lights • 47
Setting the contrast of the display • 47
Setting the date 46
Setting the date and time • 43
Setting the general pre-location
parameters on the IRG 2000 • 52
Setting the test parameters on the
system control panel • 49
Setting the time • 47
Setting up the system • 34
Shipping the system • 32
SIM/MIM
Secondary-Multiple Impulse Method
59
Special personal protective
equipment • 17
Standard delivery • 90
Storage 89
Structure of safety instructions • 7
Switching off the system in the event
of an emergency • 41
Switching on the system • 40
Switching the high voltage on and off
48
System control panel • 20
T
Taking the system out of operation
78
TDR
Time Domain Reflectometry • 53
TDR measurement on live cables • 15
TDR measurement on live cables with
the IRG 2000 as an independent
device • 33
Technical data 29
Testing the discharge unit • 82
Transportation • 31
Transporting the system in vehicles
32
Transporting the system manually
31
Turning on the IRG 2000 • 43
U
Unscreened cable with 3 phases 37,
39

Table of Contents