EasyManuals Logo

Baxi ECOGEN 24/1.0 Installation & Servicing Instructions

Baxi ECOGEN 24/1.0
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
*ATHINKControllerhereimpliesthattheRFfacilityisnotbeingusedthecustomerhasrevertedtoanallwiredsystem
AllRFconnectionsormixedwiththeuserresetoffappliance
NOTE:Eithera5LEDReceiveroraTHINKControllermustbefittedtotheapplianceforthesafetyoftheuserorvisitingservicepersonnel.
page15
7.0SiteRequirements
7.1Location
1.Mustnotbelocatedinalivingspace(recommendlocations,garage,utility,andouthouse).
2.Theremustbesufficientspaceattheinstallationlocationandintheroutetothelocationformaneuveringandoperatingtheliftingequipment(GenieGL8liftingequipment
dimensionsare64cmwidex175cmhighx95cmdeep).Thisspacemustbemaintainedforfutureaccessoftheliftingequipmentformaintenance.
3.Wallstructuremustbeasolidflatloadbearingwallofbrickorblock.Partitionandtimberframewalls,anddotanddabplasterboardarenotsuitable.Ifindoubtconsulta
StructuralEngineer.
4.Toeliminatethetransmissionofnoisefromtheapplianceanditspipeworkitisrecommendedthatthecentralheatingpipeworkisadequatelyroutedandclippedsothat
contactbetweenthestructureofthebuildingandpipeworkiseliminated.
Fig.9
Ensurethatthereisadequateclearancefortheliftingequipment.(GenieGL8liftingequipmentdimensionsare64cmwidex175cmhighx95cmdeep).

Other manuals for Baxi ECOGEN 24/1.0

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Baxi ECOGEN 24/1.0 and is the answer not in the manual?

Baxi ECOGEN 24/1.0 Specifications

General IconGeneral
BrandBaxi
ModelECOGEN 24/1.0
CategoryBoiler
LanguageEnglish

Related product manuals