EasyManuals Logo

Baxi POWER HT+ Series Installation And Service Manual

Baxi POWER HT+ Series
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #105 background imageLoading...
Page #105 background image
6. Select the Y
Yes
parameter by turning the button.
7. Confirm the parameter selection by pressing the
button.
Note
Press the
MENU
key to return to the main screen.
The reset of the timer program to zero has been successful.
9.2.14 Setting a temporary heating flow temperature
1. From the control panel main screen, turn the button to increase
or reduce the temperature value.
2. Confirm the menu selection by pressing the button
.
9.2.15 Managing boilers in cascade
Boilers in cascade are controlled and managed by the lead boiler.
1. Set the following parameters on the lead boiler:
Tab.59 Configuration lead cascade boiler
Parameter num
ber
Parameter Setting Description
3540 Auto source seq ch'over Number of hours Operating time before the auto
matic change of the lead boiler
sequence.
3541 A
Auto source seq exclusion
First
First and last
Last
None
Exclusion of the boiler or boilers
from the periodic sequence rota
tion.
See
List of installer parameters, page 74.
9.3 Accessing the information menu
1. Go to the parameters menu by pressing the
MENU
key.
Fig.
131
MW-3000142-EN-02
MENU
Yes
Time central heatin
g
CH1
Default values
Fig.
132
MW-3000143-EN-02
MENU
Tem
p
orar
y
set
p
oin
t
9 Settings
7609474 - v02 - 04092014 105

Table of Contents

Other manuals for Baxi POWER HT+ Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Baxi POWER HT+ Series and is the answer not in the manual?

Baxi POWER HT+ Series Specifications

General IconGeneral
ModelPOWER HT+ Series
CategoryBoiler
Installation TypeWall-mounted
Heat Exchanger MaterialStainless Steel
Warranty2 years
Fuel TypeNatural Gas
Control SystemIntegrated Control
Ignition TypeElectronic

Related product manuals