6 Installation
6
Installation must be carried out in accordance with the prevailing regula
tions, codes of practice and the recommendations in this manual.
6.2 Preparation
6.2.1 Accessing the internal boiler components
1. Remove the front panel by pulling firmly on the notches provided.
2. Lift and tilt the panel holding the control panel
Fig.35 Removing the front panel
MW-3000022
1
Fig.36 Tilting the panel holding the control
panel
MW-3000023
2
6 Installation
7609474 - v02 - 04092014 37