EasyManua.ls Logo

Beckhoff EL6900 - Maintenance and Appendix; Maintenance, Service Life, and Disposal

Beckhoff EL6900
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
EL6900 47Version: 2.2.0
4.4.12 EL6900 info data
Fig.41: EL6900 info data
Info data can be displayed in the cyclic process image via the checkboxes Map Project CRC and Map Serial
Number. These info data show the current safety project CRC and the serial number of the EL6900 and can
be used in a visualization, for example.
4.4.13 Loading the project into the EL6900
The project is loaded into the EL6900 via the fieldbus.
CAUTION
Use only qualified tools
Only use a qualified tool for loading, verifying and enabling the project on the EL6900!
Click the Download button on the TwinSAFE Verifier tab for loading the project.
The user must enter
his user name (default: Administrator),
the terminal serial number (printed on the outside, e.g. 197535), and
his password (default: TwinSAFE).
Note
User name and password are case-sensitive
Pay attention to upper/lower case characters for the user name and password.

Table of Contents

Related product manuals