EasyManua.ls Logo

Bender ISOMETER IRDH275 - Page 31

Bender ISOMETER IRDH275
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connection
31
IRDH275_D00122_02_M_XXEN/10.2016
Legend to wiring diagram:
1
Supply voltage U
s
(see nameplate) via 6 A fuse
For UL and CSA applications, the use of 5 A fuses is mandatory
2, 3
Connection to the 3AC system to be monitored:
connect terminals L1, L2 to neutral conductor N or
terminals L1, L2 to conductor L1, L2
4
Connection to the AC system to be monitored:
connect terminals L1, L2 to conductor L1, L2
5
Connection to the DC system to be monitored:
connect terminal L1 to conductor L+, terminal L2 to conductor L-
6
Separate connection of and KE to PE
*7
External TEST button (NO contact)
*8
External RESET button (NC contact or wire jumper),
when the terminals are open, the fault message will not be stored
*9
STANDBY by means of the function input F1, F2:
When the contact is closed, insulation measurement does not take
place;
system disconnection
10
IRDH275: current output, galvanically separated: 0…400 μA
IRDH275B: current output, galvanically separated:
0…20 mA or 4…20 mA
11
Serial interface RS485 (termination 120 Ω resistor)
12
Alarm relay 1; changeover contacts provided
13
Alarm relay 2; (device fault relay) changeover contacts provided
*
The terminal pairs 7, 8 and 9 must be wired galvanically isolate
and must not have a connection to PE !

Table of Contents

Related product manuals