POST-INSTALLATION CHECK-OFF
n Columns properly shimmed and stable
n Anchor Bolts tightened
n Pivot / Sheave Pins properly attached
nElectric power supply confirmed
n Cables adjusted properly
n Safety Locks functioning properly
n Check for hydraulic leaks
n Oil level
n Lubrication of critical components
n Check for overhead obstructions
n All Screws, Bolts, and Pins securely fastened
nSurrounding area clean
nOperation, Maintenance and Safety Manuals
on site.
nPerform an Operational Test with a typical Vehicle
To reduce the risk of property damage, personal injury, or
loss of life, NEVER park any vehicle on the Lift’s runways
without placing two suitable wheel chocks behind each
rear tire so that the vehicle cannot roll backward off the
Lift. Vehicles parked on Lift MUST also be placed in Park
or First Gear (Manual Transmission) with the Parking Brake
fully applied.
33
Wheels Chock must be used on the
rear wheels. (See Fig 18.1)
Fig 18.1