EasyManua.ls Logo

Benelli BN302 - SCHEDULED MAINTENANCE

Benelli BN302
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
107
EN
SCHEDULED MAINTENANCE
SCHEDULED MAINTENANCE
Improper maintenance or failure to perform maintenance works will increase the risk of accidents or damage to the motorbike. Always
use original Benelli Q.J. replacement parts.
The use of non-original replacement parts may accelerate motorbike wear and tear and cut shorts its life. Failure to perform recom-
mended operations or the use of non-original parts may render the legal warranty null and void.
The replacement and/or topping up of lubricants and uids, must only be carried out with the recommended products.
NOTE:
PROTECTING THE ENVIRONMENT
Benelli Q.J., to protect the interests of the community, raises awareness among customers and technical assistance operators to
use the vehicle and dispose of its parts in full compliance with the current standards against environmental pollution, disposal and
recycling of refuse.
IMPORTANT:
The most important maintenance and checks are listed in speci c tables, together with their frequency.
It is essential to carry out these operations to keep your motorcycle ef cient and safe.
Intervals given in the scheduled maintenance and lubrication table must be considered as a general guideline for conditions of normal
use only. It may be necessary to reduce these intervals according to weather conditions, terrain, geographical situation and individual
use.
Some operations can be performed by the user as long as they have the necessary skills and in any case, as long as this is provided
for in this manual.
In any case, carry out operations at an authorised Benelli workshop. A list of workshops is available on our website www.benelli.com
INDICE
SCHEDULED MAINTENANCE
EN
111

Table of Contents

Related product manuals