EasyManua.ls Logo

Bentone B40 User Manual

Bentone B40
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Providing sustainable energy solutions worldwide
178 086 53-2 2017-10–25
Installation and Maintenance instruction
B 30 / B 40
J/K
Question and Answer IconNeed help?

Do you have a question about the Bentone B40 and is the answer not in the manual?

Bentone B40 Specifications

General IconGeneral
BrandBentone
ModelB40
CategoryBurner
LanguageEnglish

Summary

Technical Data

Intended Use

Specifies the intended applications for the burner, such as water and steam generators.

Dimensions B30/B40

Provides detailed physical dimensions for the B30 and B40 burner models.

Working Fields

Outlines the operational performance ranges (kg/h, kW) for B30 and B40 burners.

Nozzle and Pressure Recommendations

Details recommended nozzle types and operating pressures for optimal performance.

Nozzle Table

Comprehensive table listing nozzle specifications (Gph, kg/h, kW, Mcal/h) at various pressures.

Component Identification

Identifies and illustrates the various components of the burner assembly.

Installation

Handling and Lifting

Guidelines for safely handling and lifting the burner unit.

Acceptance Inspection and Preparations

Steps for inspecting the unit and preparing the site before installation.

Oil Distribution System

Instructions for designing and setting up the oil supply system for the burner.

Electrical Connection

Procedures and precautions for connecting the burner to the electrical supply.

Burner Installation Procedure

Detailed steps for physically installing the burner onto the boiler.

Oil Line Seal Check

How to check for and address oil leaks in the connection lines.

Basic Settings

Pre-Purge Time Calculation

Method for calculating the necessary pre-purge time based on boiler type and output.

Recommended Excess Air

Guidelines for setting excess air levels for optimal combustion efficiency.

Setting Values for B30/B40

Charts and values for setting the nozzle assembly and air damper for B30 and B40.

Airflow and Pressure Switch Adjustment

Procedures for adjusting airflow, nozzle assembly, and the air pressure switch.

Burner Servicing

Combustion Assembly Servicing

Steps for removing, cleaning, and reinstalling the combustion assembly.

Air Damper Servicing

Procedures for servicing and adjusting the burner's air dampers.

Oil Pump Replacement

Detailed steps for replacing the oil pump unit.

Electrical Component Replacement

Guidance on replacing electrical components within the burner.

Vibration Monitoring

Checks and actions related to burner vibration levels and causes.

Pump Instructions

Suntec AS47CK Technical Data

Key technical specifications for the Suntec AS47CK oil pump.

Suntec AS47CK Components and Systems

Identifies pump components and describes one-pipe and two-pipe system configurations.

Suntec AS47CK Function and Suction Tables

Explains the operational function of the AS47CK pump and provides suction pipe data.

Electrical Equipment

LAL 2.25 Wiring Diagram

Electrical schematic showing connections for the LAL 2.25 control system.

LAL 2.25 Component List

Lists and identifies all components associated with the LAL 2.25 control system.

LAL Control System Function

Details the operational modes and safety features of the LAL control system.

Fault Location

Burner Fails to Start

Identifies causes and remedies for when the burner does not initiate operation.

Burner Fails After Normal Use

Troubleshooting steps for issues arising after the burner has been running.

Ignition and Pulsation Issues

Addresses problems with delayed ignition and burner pulsation during startup.

Pump Performance Issues

Diagnosing and resolving problems related to pump noise and pressure.

Related product manuals