EasyManua.ls Logo

Binder COMBIMASS compact - Chapter 2 Installation; Preparation for installation

Binder COMBIMASS compact
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
COMBIMASS
®
compact
Doc. No.: 0905ME20500
11
Chapter 2 Installation
Chapter 2 Installation
Preparation for installation
Receipt of goods:
Carefully unpack the measuring system.
Check that all items were correctly and completely delivered in accordance with the delivery note.
Check the measuring system for damage before you install it.
If you have observed all the points, then continue with the installation of the sensor.
If there are any reasons for complaint, please contact customer service.
Complaints
Please contact first the responsible service technician. If you don’t know the telephone number of your
service technician please contact our headquarter in
Ulm/Germany. We will be pleased to help you.
Please return a damaged or incorrectly supplied system to the following address:
BINDER GmbH
Buchbrunnenweg 18
D-89091 Ulm
Tel. : +49 (0)731 189 98-0
Fax : +49 (0)731 189 98-88
Please include a note on the covering letter such as, e.g. "System defective, device has not been used"
or "Incorrect supply, device has not been used". In these cases, no clearance certificate is required
(see page 51).
Calibration note
The mass flow measuring system is calibrated to suit your application. All relevant information regarding
the calibration of your system can be obtained from the calibration data sheet.
No further settings or adjustments are required. The system is ready for operation.
ESD (damage caused by electrostatic discharges)
The electronics can be damaged by electrostatic discharge (ESD). Carry out repairs, modifications and tests
at an ESD workplace.
If such a workplace is not available, wear an antistatic wrist strap or touch a suitably conductive, earthed
body.
Damage which arises as a result of incorrect handling cannot be accepted under the terms of the guaran-
tee.
NOTE
ATTE NT IO N!

Table of Contents