EasyManua.ls Logo

BIO RAD S3e - Initial Set Up: Start-up and Fluidics Procedure

BIO RAD S3e
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Initial Set Up: Start-up and Fluidics Procedure (≈ 20 minutes)
In case you are not the first user of the current day, please confirm with the previous
user whether a low-pressure cleaning final set up has been performed. If so, skip both
start-up and quality control procedures. NEVERTHELESS, DO NOT FORGET TO CHECK THE
FLUIDICS. IF NEEDED, PERFORM THE “HOT SWAP” PROCEDURE (See Swapping Fluidics
During Sorting: “Hot Swap”).
1. Open the bulk fluidics door
2. Detach the quick disconnect from the cap assembly by pushing in the metal
button and lifting the quick disconnect until it engages the magnetic holder above it
3. Slightly lift and pull out the container
4. Uncap the cap assembly from the container

Related product manuals