6.6.3 Grounding Protection (PE)
Step 1: It is recommended to use a 12AWG outdoor power cable and RNB3.5-5S OT
terminals. Strip the insulation layer of the ground cable with a cable stripper to a
proper length. See Fig. 6-9-1.
Step 2: Insert the exposed core wires into the OT terminal and crimp them with a
crimper, as shown in Fig. 6-9-2.
Step 3: Fix the OT terminal with M5 screws at the position shown in Fig. 6-9-3.
Recommended torque: 3N m (27 to 32 in-lbs).
Note: L3 is the length between the insulation of the cable and the crimped part. L4
is the length between the crimped part and core wires protruding from the
crimped part.
Danger
The positive and negative terminals of the PV (photovoltaic) system
inverter should not be grounded, as it may lead to inverter failure.
However, it is important to ground all non-current carrying metal parts,
including brackets, distribution boxes, inverter enclosures, battery pack
enclosures, and other relevant components.
B500
B500
6000W
3000W
Solar panels
Solar panels
DRMs
2
1
3 4
2
1
3 4
meter
L1 L2
L1
L2
N
L1
L2
F1
F6
F2
F3
F4
F5
F7
F8
F9
L2
L1
L1
L2
BAT-
BAT-
BAT+
BAT+
BAT+
BAT+
BAT-
BAT-
TO PCS
PACK LINK IN
PACK LINK OUT
TO PCS
PACK LINK IN
PACK LINK OUT
1 2 3 4 5 6
L1
L2
N
GND
N
L2
L1
G
N
L2
L1
G
G
L2
L1
N
Standard
cable
Standard
cable
Earth
+
-
+
-
LINK PORT2
LINK PORT1
PV1
PV2
GRID
BACKUP
EP800
IOT BOX
G-N Link
G-Bar
N-Bar
1
2
3
4
Transfer
Switch
G-Bar
N-Bar
Essential
Load
Non-essential
Load
Main Panel
Sub Panel
QF1
QF2
L1
L2
N
12AWG
10AWG
10AWG
12AWG
Standard cable
Standard cable

Related product manuals