BOSCH
Frost
protection
limit
temperature
(outside
temperature
threshold)
Under
this
menu
item
the
limit
temperature
for
the
frost
protection
(outside
temperature
threshold)
is
set.
It
is
only
effective
if
Room
and
outdoor
temp.
or
Room
and
outdoor
temp.
is
set
in
the
Frost
protection
menu
.
&
NonCE:
Domestic
hot
water
pi
pework
may
freeze
if
the
I
frost
protection
limit
temperature
is
set
too
low
and
in
prolonged
periods
with
outside
temperature
below
0 DC.
~
Adjust
frost
protection
limit
temperature
(default
setting
=
5°C)
to
the
heating
system
_
~
Do
not
set
the
frost
protection
limit
temperature
too
low
.
Damages
caused
by
a
low
frost
protection
limit
temperature
are
not
covered
by
the
warranty
.
~
Set
the
frost
protection
limit
temperature
and
frost
protection
for
all
heating/cooling
circuits
.
~
To
ensure
frost
protection
for
the
entire
heating
system
.
set
either
Room
and
outdoor
temp.
or
Room
and
outdoor
temp.
in
the
Frost
protection
menu.
If
the
outside
temperature
exceeds
the
frost
protection
limit
temperature
by
1 K (O
C)
and
there
is
no
heat
requirement
from
the
heating
system,
the
heating
pump
switches
off.
If
the
outside
temperature
drops
below
the
frost
protection
limit
temperature.
the
heating
pump
switches
on.
Service
menu
The
Room
temperature
setting
does
not
offer
absolute
frost
protection.
because
pipework
insta
lled
in
fa~ades.
for
instance.
can
freeze
.
This
can
happen
even
though
the
temperature
in
the
reference
room
is
considerably
above
5°C
as
the
result
of
outside
heat
sources.
As
an
outside
temperature
sensor
is
installed.
frost
protection
can
be
assured
for
the
entire
heating
system
:
~
In
the
Frost
protection
menu.
set
either
Room
and
outdoor
temp.
or
Room
and
outdoor
temp
..
6.3.4
Screed
drying
menu
A
screed
drying
program
is
set
for
the
selected
heating
circuit
or
the
entire
heating
system
in
this
menu.
To
dry
a
new
screed
the
heating
system
automatically
runs
the
screed
drying
program
once.
In
case
of
a
voltage
failure
the
user
interface
automatically
continues
with
the
screed
drying
program
.
The
voltage
failure.
however.
may
not
last
long
er
than
the
power
reserve
of
the
user
interface
or
a
maximum
duration
of
an
interruption.
This
menu
is
only
available
if
at
least
one
underfloor
heating
circuit
is
installed
and
set
in
heating
system
.
&
NOTICE:
Risk
of
damaging
or
destroying
the
screed!
,
~
With
multi-circuit
systems.
this
function
can
only
be
used
in
combination
with
a
heating
circuit
with
mixing
valve
.
~
Set
the
screed
drying
according
to
the
instructions
of
the
manufacturer.
~
In
spite
of
the
screed
drying
function.
visitthe
system
daily
and
keep
the
prescribed
records.
I
Dwell
time
before
start
No
dwell
time
The
screed
drying
program
starts
after
the
set
waiting
time
(selected
heating
circuits
are
switched
off
I
Start
phase
duration
Start
phase
temperature
Heat-up
phase
step
width
Heat-up
phase
temp
. diff
Holding
phase
duration
I
Holding
phase
temp.
Cool
-
dn
phase
step
wdth
,
Cool-down
phase
t.diff
Endphase
duration
I
tEnd
phase
temperature
Max
.
interruption
time
Screed
dry
.
system
,
1
...
50days
No
start
phase
1
...
3
...
30days
20
...
25
...
55°C
No
heat-up
phase
1 ...
10
days
1... 5
...
35K
1
...
7 ... 99
days
20
...
55
°C
No
cool-down
phase
1 ...
10
days
1... 5
...
35K
I
during
the
waiting
time.
frost
protection
is
active
;
default
setting
:
no
waiting
time.
~
Fig
.
13
.
time
before
day
0)
TIme
lag
between
the
beginning
of
the
start
phase
and
the
next
phase
(~
Fig.
13.
[1])
Flow
temperature
during
the
start
phase
(
~
Fig.
13.
[1))
TIme
lag
between
the
steps
(step
width)
in
the
heat-up
phase
(
~
Fig
.
13]3])
Temperature
differential
between
the
steps
in
the
heat"\Jp
phase
(~
Fig
.
13.
[2])
~
Time
lag
between
the
beginning
of
the
holding
phase
(duration
of
the
maximum
temperature
for
screed
drying)
and
the
next
phase
(~Fig.
13.
[4])
Flow
temperature
during
the
holding
phase
(
~
Fig
.
13.
[4])
Time
lag
between
the
steps
(step
width)
in
the
cooling
phase
(
~
Fig
.
13.
[5))
Temperature
differential
between
the
steps
in
the
cooling
phase
(
~
Fig
.
13.
[6])
No
end
phase
TIme
lag
between
the
beginning
of
the
end
phase
(last
temperature
step)
and
the
end
of
the
screed
drying
""
p-e-
rm
-a-
ne
-n
-:
U-y
--'-----
program
(
~
Fig
.
13.
[7])
UOdays
1
20
...
25
...
55"C
2 ... 12 ... 24h
Yes
No
Flow
temperature
during
end
phase
(
~
Fig
.
13.
[7])
Maximum
duration
of
a
screed
drying
interruption
(e
.
g.
through
stop
of
the
screed
or
power
failure)
until
a
fault
display
is
output.
-----------
Screed
drying
is
active
for
all
heating
circuits
of
the
system
Notice
:
Single
heating
circuits
cannot
be
selected
.
DHW
heating
is
not
possible
.
The
menus
and
menu
items
with
settings
for
DHW
are
disabled
.
Screed
drying
is
not
active
for
all
heating
circuits
I
Notice
:
Single
heating
circuits
can
be
selected
.
DHW
heating
is
possible
.
The
menus
and
menu
items
with
settings
for
DHW
are
enabled
.
~--------~----------~--------------
Table
30
Setting
in
the
Screed
drying
menu
(Fig.
13
shows
the
default
setting
of
the
screed
drying
program)

Other manuals for Bosch HPC 400

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Bosch HPC 400 and is the answer not in the manual?

Bosch HPC 400 Specifications

General IconGeneral
BrandBosch
ModelHPC 400
CategoryControl Panel
LanguageEnglish

Related product manuals