3 - INSTALLATION INSPECTION
Before operating unit, be sure installation
meets all requirements in the Installation
Manual provided with your unit.
CAUTION: Follow cleaning instruc-
tions as outlined in this manual before
operating the first time. See section 11 -
CLEANING.
• A remote circuit breaker or fuse should
be installed in the main power supply
located in a path of exit and clearly iden-
tified.
• To avoid splashing of hot liquid, unit
must be restrained to prevent tipping.
This can be done by installing the unit in
a battery of appliances, in an alcove or
with adequate ties.
• See Safety Relief Valve under GET-
TING TO KNOW YOUR BROASTER
®
PRESSURE FRYER. DO NOT install
unit where traffic area’s are on either
side or in back of unit.
1800GH:
WARNING: Electrical Grounding
Instructions - The Model 1800GH is
equipped with a three-prong (grounding)
plug for your protection against shock haz-
ard and should be plugged directly into a
properly grounded three-prong receptacle.
DO NOT cut or remove grounding prong
from this plug.
• A gas shutoff valve, installed in gas sup-
ply line, should be located in a path of
exit and clearly identified.
Gas Conversion: Contact your local
Broaster Company representative for con-
verting from one type of gas to another.
3 - 1
Manual #13897 10/97 Rev 9/05