5.9. Ultraviolet Lights Installation
Next, the installer will be prompted to select whether ultraviolet lights are installed
in the system. Select YES or NO, then touch NEXT.
5.10. Equipment Summary
The equipment summary screen will appear after accessories have been selected.
This screen will give a summary of all equipment automatically found or manually
selected. If an incorrect selection was made, touch RE--INSTALL to restart the
installation process. See the Evolution System HVAC equipment Installation
Instructions for more details, as provided.
Example: SPP Equipment Summary Screen
A13120
5.11. Airflow Verification Check
The airflow verification check screen will appear next, as the system performs this
operation. This process will take about 1--1/2 minutes to complete. When
completed, a screen will appear displaying the results of the check.
If the system has an indoor unit equipped with a previous--version CFM--controlled
blower system, the screen will display the static pressure (in inches of water) across
the equipment at the expected highest delivered airflow. If the blower RPM is
greater than 1200, a warning will appear, but equipment operation and the