This section is to set the UPS critical loading. (shown as %) NetAgent will send a warning
message when the UPS is overloaded.
Critical Temperature (C)
This section is to set the UPS critical internal temperature. NetAgent will send warning
messages when the UPS overheats.
Critical Capacity (%)
This section is to set the UPS critical battery capacity (shown as % ) NetAgent will send
warning messages when UPS low battery occurs
Fig.27 UPS Configuration
5.2.4 UPS On/Off Schedule
This page is to schedule On/Off time for the UPS and Wake On Lan.
5.2.4.1 Weekly Schedule
This section is to set the time to turn on/off the UPS each day in the week
5.2.4.2 Date Schedule
This section is to set the time to turn on/off the UPS on particular days. (Eg, holidays.) The
settings here override the settings in Weekly Schedule.
5.2.4.3 Warning will be initiated _ before Schedule shutdown event
NetAgent will send a warning message before a scheduled shutdown. This section sets the
delay time period after the message is sent and before the scheduled shutdown is started.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BT NetAgent Series and is the answer not in the manual?

BT NetAgent Series Specifications

General IconGeneral
BrandBT
ModelNetAgent Series
CategoryControl Unit
LanguageEnglish