EasyManua.ls Logo

Buchi Rotavapor R-220 Pro Continuous - 7 Condenser Clamps

Buchi Rotavapor R-220 Pro Continuous
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Putting into operation
41 R-220 Pro Continuous Operation Manual, Version A
5.7 Condenser clamps
a
b
c
Flat spring
a
Turn the lever counterclockwise to loosen / open the clamp. It is not necessar y to completely open the clamp!
b
Pull the support o-ring onto the rod. Shift the opened clamp with the at spring side onto the rod until it
touches the o-ring. The clamp weight is now supported by the o-ring.
c
Inser t the condenser with the mounted holder (here illustrated without condenser!) into the free end of the
clamp. Turn the xation screw clockwise to xate the condenser in its position.

Table of Contents

Related product manuals