5 Putting into operation
58 R-220 Pro Continuous Operation Manual, Version A
5.21 Final installation check
After installation has been completed and before performing the rst distillation make sure the installa-
tion has been carried out correctly:
X Inspect glassware visually for possible damage
X Inspect safe and correct routing of all cables and hoses
X Check that all connections (steam, water, vacuum) have been xed properly
X Check all supply hoses for tightness
X If applicable: Check overall system vacuum tightness (see operation manual I-300 Pro)