5 Putting into operation
43 R-220 Pro Continuous Operation Manual, Version A
5.9 Setting up the glass assembly
Putting together the glass assembly in the following order:
Distribution piece a with sensor b
Expansion vessel c
U tube
Condenser
Double connection piece
Vacuum connection of expansion vessel
Valve to receiving ask
Receiving ask
Draining valve
Aeration valve
Level and overow sensor
CAUTION
Risk of damage to the device due to transport-related lling material left in the cooler.
• Thoroughly clean the cooler before the installation to avoid damage from silica sand.
a
c
b