4 Putting into Service
4.1 Putting into service
4.2 Making Ready for Operation
Before initial operation, no electrical measurement is necessary for beds with a 24-volt sys-
tem, since these beds are tested for electrical safety and functionality by the manufacturer
before they leave the factory in perfect condition.
Allow the bed to adjust to room temperature for about 20 minutes if it was stored be-
forehand at the lowest or highest permissible temperature.
After the bed has been assembled, carry out a check in accordance with the chapter
Part B: Maintenance » 47.
Clean and disinfect the bed before it is used for the first time and before every re-use in
accordance with the chapter
Part B: Cleaning and Disinfection » 42.
The bed is ready for operation if all the steps described in the chapter Part B: Assem-
bling the Care Bed » 10 have been read and carried out successfully.
Before putting the bed into service each time, the user must check that:
The bed has been cleaned and disinfected.
The castors are braked.
The power supply is compatible with the bed (AC 230 V, 50/60 Hz, -15% - +10%).
The switch mode power supply is connected and the cable is routed in such a way that
it cannot be damaged.
The switch mode power supply, drive cables and handset cable cannot be damaged by
moving parts of the bed.
No obstacles such as bedside cabinets, supply rails or chairs will inhibit adjustments.
All adjustments function properly and have been checked (see Part B: Inspections and
Function Checks » 48).
The bed must not be put into operation unless these checks have been carried out!