END OF INSTALLATION
STAGE 2
BEFORE STARTING STAGE 3 -
Commissioning the Control Panel
PLEASE CHECK THAT YOU HAVE CORRECTLY:
Ref Page
1. FITTING THE CONTROL PANEL
IN THE CASING 2.1 8
2. WIRED THE MOTOR AS SHOWN (Fig 7) 2.2 912
3. WIRED IN THE SAFETY PHOTOCELLS
AS SHOWN (Fig 8) 2.3 10
4. INSERTED THE RADIO FREQUENCY
CARD AS SHOWN (Fig 9) 2.4 10
5. WIRED IN THE TUNED ANTENNA
CODED AS SHOWN (Fig 10) 2.5 11
6. PROGRAMMED THE REMOTE CONTROLS
AS SHOWN (Fig 11) 2.6 11
7. POWERED UP THE CONTROL PANEL 2.7 11
NOW STAGE 2 IS FULLY COMPLETED YOU ARE READY TO
BEGIN STAGE 3 OF YOUR FROG AUTOMATION KIT
INSTALLATION
12

Other manuals for CAME FROG series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CAME FROG series and is the answer not in the manual?

CAME FROG series Specifications

General IconGeneral
Motor Voltage24 V DC
Max Gate Weight800 kg
Duty Cycle30%
Limit SwitchYes
Power Supply230 V AC
Safety FeaturesObstacle detection
TypeElectromechanical underground gate opener

Related product manuals