EasyManua.ls Logo

Carrier 58HDX - Page 18

Carrier 58HDX
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
»
>
EXHAUST
\__
Plastic
Caps
(2)
__-~~
On
Some
Models
ONLY
Yellow
or
black
Coupling
&
Clamps_
(Optional)
Vent
Drain
&
Clamps
=>
|
Dual
Pressure
Switch
Detail
.
anne
Drain
Tee
Drain
Tube
Black
Rubber
1/9"
ID
&
Clamps
~~
Relief
Tube
Black
Rubber
3/44”
ID
Drain
Tube
Single
Pressure
Corrugated
5/,”
ID.
Switch
&
Clamps
P
Street
Elbow
on
My”
CPVC
Drain
Connector
Black
PVC
(Loose
parts
bag)
3/4”
PVC
X
fp”
CPVC
(Loose
parts
bag)
Casing
Grommet
Black
Rubber.
|
5/,”
ID
Ml
(Loose
parts
bag)
Drain
Line
Vent
Tee
3/,”
PVC
or
1Jo”
CPVC
(Field
supplied)
Drain
Tube
Black
Rubber
5/,”
ID
&
Clamps,
Cut
length
to
fit
(Loose
parts
bag)
25-24-80
Representative
drawing
only,
some
models
may
vary
in
appearance.
A07708
Fig.
10
-
Upfiow
Installations
Top
Vent
Upflow
Installations
Top
Vent
(See
Fig.
10)
¢
Remove
knockout
from
the
side
of
the
furnace
casing
where
drain
tube
will
exit.
*
Install
casing
grommet
(black
rubber
°/s”
(16
mm)
ID
grommet
-
in
loose
parts
bag)
*
Install
the
1/."(13
mm)
CPVC
street
elbow
on
discharge
of
trap
¢
Install
the
black
PVC
tube
connector
Cla”
(18
mm)
PVC
x
15"
(13
mm)
CPVC
from
loose
parts
bag)
as
shown
in
the
illustration
above.
*
Cut
the
black
drain
tube
(/g"(16
mm)
ID
-
in
loose
parts
bag)
to
length
to
fit
between
trap
and
tube
connector
through
grommet.
¢
Clamp
both ends
of
the
drain
tube
using
clamps
provided.
¢
Glue
the
CPVC
street
elbow
to
the
trap
using
appropriate
cleaner
and
solvent
cement.
¢
The
field
supplied
3/4"
PVC
or
"(13
mm)
CPVC
drain
line
vent
tee
must
vent
outside
the
furnace
cabinet
(see
exploded
view
above).
NOTE:
It
is
recommended
that
all
PVC
piping
and
fitting
connections
be
fit
up
and
inspected
before
final
cementing.
Trap
must
be
primed
before
operation.
Verify
all
condensate
drain
connections
are
securely
clamped.
A
coupling
and
clamps
(in
loose
part
bag)
may
be
installed
as
shown
for
future
servicing
of
the
vent
system.
NOTE:
“PVC”
is
used
as
a
generic
term.
Pipe
and
fitting
materials
used
must
be
acceptable
to
the
local
code
officials
having
jurisdiction.
18

Other manuals for Carrier 58HDX

Related product manuals