EasyManua.ls Logo

Carrier 58HDX - Page 19

Carrier 58HDX
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Plastic
Cap
(~~
Yellow
or
black
Coupling
&
Clamps
_-~
On
Some
Models
ONLY
(Optional)
Vent
Drain
&
Clamps
Either:
The
PVC
Drain
Tee
or
a
field
supplied
2”
Pvc
Tee
Dual
Pressure
Switch
Detail
_-
3hyg"
ID
Rubber
Tube
Tee
Trap
White
PVC
(loose
parts
bag)
Drain
Tube
Black
Rubber
'f”
ID
&
Clamps
Drain
Tube
Drain
Connector
Black
PVC
Corrugated
3/,”
PVC
X
1/,”
CPVC
5/,”
ID
&
Clamps
(Loose
parts
bag)
|
Casing
Grommet
Black
Rubber
_
5f,”
ID
-
mf
(Loose
parts
bag)
Single
Pressure
Switch
SIDE
VIEW
i
A
NOTE‘
Built-in
channel
will
be
angled
to
10°
also.
Drain
Line
Vent
Tee
3/,”
PVC
or
'/.”
CPVC
(Field
supplied)
25-24-81
Representative
drawing
only,
some
models
may
vary
in
appearance.
A07707
Fig.
11
-
Upfiow
Installations
Vent
through
Left Side
Upflow
Installations
Vent
through
Left
Side
(See
Fig.
11)
¢
Remove
drain
tee
from
inducer
discharge
and
remove
black
drain
tube
(/2"(13
mm)
ID)
from
bottom
of
drain
tee.
¢
Install
Vent
Pipe
grommet
in
side
of
casing.
¢
Cut
an
appropriate
length
of
2”
(51
mm)
PVC
pipe
long
enough
to
exit
the
cabinet
and
connect
the
vent
drain
to
either:
Astandard
field
supplied
2”
(51
mm)
PVC
tee, or
A2"
PVC
coupling
fastened
onto
the
drain
tee.
¢
Install
tee
trap into
bottom
of
tee.
¢
Remove
knockout
from
the
side
of
the
furnace
casing
where
drain
tube
will
exit.
*
Install
the
1/2"
(13
mm)CPVC
street
elbow
on
discharge
of
trap
¢
Install
the
black
PVC
drain
connector
C/s"(19
mm)
PVC
x
'/)"(13
mm)
CPVC
from
loose
parts
bag)
as
shown
in
the
illustration
above.
*
Cut
the
black
drain
tube
(°/s”(16
mm)
ID
-
in
loose
parts
bag)
to
length
to
fit
between
trap
and
tube
connector
through
grommet.
¢
Clamp
both ends
of
the
drain
tube
using
clamps
provided.
¢
Glue
the
CPVC
street
elbow
to
the
trap
using
appropriate
cleaner
and
solvent
cement.
¢
Connect
the
tee
trap
and
the
main
drain
line
exiting
the
casing
as
shown
in
Fig.
19.
NOTE:
It
is
recommended
that
all
PVC
piping
and
fitting
connections
be
fit
up
and
inspected
before
final
cementing.
Both
the
internal
trap
and
the
external
tee
trap
must
be
primed
before
operation.
Verify
all
condensate
drain
connections
are
securely
clamped.
A
coupling
and
clamps
(in
loose
part
bag)
may
be
installed
as
shown
for
future
servicing
of
the
vent
system.
19

Other manuals for Carrier 58HDX

Related product manuals