Assembly and operating instructions
CENTAX-L
016L-00050…00090-FS10
CENTA Antriebe Kirschey GmbH 38 / 46
8 Care and maintenance
Injuries can occur as a result of:
Contact with rotating parts
Before starting work at the coupling, switch off the plant and secure
against unintentional start-up.
The coupling requires low maintenance. It is possible to perform a visual
inspection during the regular scheduled maintenance intervals for the complete
unit. Every 12 month a visual inspection is strictly required.
8.1 Work to be performed
8.1.1 Cleaning the coupling
Remove any loose dirt from the coupling.
8.1.2 Visual inspection of the coupling
Inspect the coupling for cracks, chips or missing parts.
Replace faulty and missing parts.
8.1.3 Visual inspection of links
Make a visual inspection of the links every 12 months.
Pay particular attention to the rubber bushes of the links. Squash folds and small
cracks of up to 1 mm may be considered normal.
In the case of crack depths in excess of 1 mm, or detachment of the rubber-to-
metal bond, the links must be exchanged.
Exchange the links:
In the event of damage
When replacing the rubber elements
Links are packaged in sets.
All links of a link set are the same weight.
Only mount or replace links in complete sets.