EasyManua.ls Logo

Cisco 8500 - Replace the Switch Main Board

Cisco 8500
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 49: Insert a SCM into the Chassis
b) Slide the SCM into the slot until the ejector lever engages with the chassis.
c) Close the ejector lever until the ejector lever latch clicks into place. Slightly push on the ejector lever to
verify that the latch is engaged and that the SCM is seated in the chassis.
d) Attach each interface cable to the appropriate port on the SCM.
e) Verify that the status LED turn on and appears amber.
Replace the Switch Main Board
Statement 1090Installation by Skilled Person
Only a skilled person should be allowed to install, replace, or service this equipment. See statement 1089 for
the definition of a skilled person.
There are no serviceable parts inside. To avoid risk of electric shock, do not open.
Warning
Hardware Installation Guide for Cisco 8500 Switches
75
Replace Chassis Components
Replace the Switch Main Board

Table of Contents

Related product manuals