EasyManua.ls Logo

Cloos qineo PULSE MASTER-Plus - Page 4

Cloos qineo PULSE MASTER-Plus
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Brief instructions Schematic design
Procedure for commissioning
1. Select current contact tube, drive rollers and core or liner
according to the filler metal.
2. Check current contact tube and welding torch connection
for solid fit.
3. Check wire drive rollers for cleanliness and correct fit.
4. Lay connection cable assembly as shown at the top left.
5. Lay the earth cable as shown at the top left.
6. Check the earth cable on the welding machine and on the
workpiece / welding table for solid fit.
7. Adjust the correct gas flow rate.
8. Preselect the characteristic curve (see back).
Notice
Inductance effect
• The laying of the connection cable assembly and the
earth cable has a considerable effect on the welding char-
acteristics.
• Make sure that the connection cable assembly and the
earth cable are laid correctly and avoid coil windings (see
illustrations on the left).

Table of Contents

Related product manuals