EasyManua.ls Logo

COBHAM 7516A - Startup Sequence

COBHAM 7516A
167 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Startup sequence
98-175666-A Chapter 4: Setup of the antenna 4-40
Example: EVENT 1/4*: This is the first event out of a list of 4 and there has been a
change in the list. EVENT 1/4 will always be shown, the * indicates that there
has been a change.
4.5 Startup sequence
Once the system is configured and a VSAT profile is active, the startup sequence is as
follows:
Antenna POST pending
Antenna SW upload (If the software versions in the ADU and BDU are not the same,
a software update is done during startup.)
Antenna POST
•Ready
•Acquiring Signal
•Tracking
When the display shows TRACKING and the LED Logon is steady green, the system is
operational.

Table of Contents

Related product manuals