EasyManua.ls Logo

COBIO S80 - Quality Control Procedures

COBIO S80
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CB-MF-SOP-002
A/1
23
When adding test tube rack must be in the red light is put out to the feeding platform, or
push test tube rack hook will overturn the test tube rack at the time of return.
5 Quality Control
5.1 Quality Control
Figure 5-1
Select the [quality control] item in the [run] menu, that is, the following dialog box pops up:
Figure 5-2
Click [Start] to start quality operation.