Technical Manual CODEL
25
6.2.1.2. Remove ribbon cable.
6.2.1.3. Remove the four screws from the four corners of the E-Cell. Ensure that these are kept
safe.
6.2.1.4. Slowly remove the E-Cell from the Unit.
6.2.1.5. Insert the new E-Cell in to the unit and screw back in to place.
6.2.1.6. Following this procedure, a calibration must be carried out, follow the steps from section
6.1.1. to section 6.1.4.6. to calibrate.
Note: Failure to replace cells will invalidate the warranty and performance of the analysers after this
time cannot be guaranteed.