Preventive maintenance
43
HS-RC-C5E-MAN_04.fm
00/0309
7. PREVENTIVE MAINTENANCE
This chapter deals with the following topics:
– Precautions before starting
– Equipment and tools required
– Preventive maintenance plan
7.1 Precautions before starting
– Read carefully the instructions in Chap.2. - Maintenance prescriptions on page 19
– To guarantee the Control Unit proper operating, it is necessary to carry out
preventive maintenance activities periodically, to reduce the amount of faults
caused by the ordinary deterioration over time and preserve its functional features
longer.
7.2 Equipment and tools required
The minimum equipment to carry out preventive maintenance activities on the C5G
Control Unit is:
In case of poor or missing preventive maintenance activities during the warranty
period, this will be regarded as prejudicial to the warranty itself.
Tab. 7.1 - Equipment and tools required
Vacuum-cleaner
Soft bristle brush
Crossheaded and bladeheaded screwdrivers set
Allen spanner set (sizes in mm)
Ecological solvent
Cases
Gloves