Setting out of work and dismantling
97
HS-RC-C5E-MAN_07.fm
00/0309
10. SETTING OUT OF WORK AND
DISMANTLING
This chapter deals with the following topics:
– Precautions before starting
– Staff to set the plant out of work and dismantle it
– Equipment and tools required
– Setting out of work and dismantling procedure
– Removing the pile and battery from the Control Unit
10.1 Precautions before starting
The robot system (consisting of Robot and Control Unit) shall be dismantled in
compliance with the environmental prescriptions and according to the methodologies in
force in the land where it is installed.
Prepare different containers to collect the different materials separately.
10.2 Staff to set the plant out of work and
dismantle it
The staff that shall perform the dismantling shall be suitably trained, in order to be able
to use the lifting means properly.
Moreover, the staff shall be warned or trained (in electrics) and therefore be aware of
the dangers associated with electric energy and of the measures to be taken when
working on electric connections.
10.3 Equipment and tools required
– Ordinary mechanical and electric equipment.
– Containers.
10.4 Setting out of work and dismantling
procedure
In this section are described the main steps to perform the robot system dismantling at
the end of its operating life.
The activities below are to be carried out by the Staff to set the plant out of work and
dismantle it only:
a. create around the robot system sufficient space to perform all movements without
endangering the staff
b. move the robot to transport position and mount the axes locking items (if present),
following the instructions on the plate posted on the robot and its Technical
Documents.