55
HS-RC-C5E-UPS_01.fm
00/0309
m. If one or more modules have been removed:
m.1 Fasten the UPS module on the omega guide.
m.2 Mount back the removed option panel.
Transfer the flat batteries to the suitable waste collection sites.
For further details, please refer to Chap. Setting out of work and
dismantling procedure on page 97
Follow-up procedure
– The battery needs about 3 hours for a complete charge and therefore to be able
to operate again.
– During the charging period, the Control Unit may not be able to guarantee
controlled shutdowns in case of powering interruption. Always perform the
suitable shutdown software procedure.
Operating procedure (Continued)