q. Fit the new condensate
drainage pipe in the eyebolt and
then in the collecting can. Be
careful to the pipe path, that
shall go downwards. Cut the
pipe eccess length.
r. Lift the conditioner front blind
panel and make sure the value
is set at 45 °C (default value).
s. Close the front panel.
Fllow-up procedure
Make sure at least 8 hours have elapsed for the stabilisation (without conditioner
capsizing) before setting the conditioner at work.
The conditioner start-up is performed only when the box door/s are in the closed
position controlled by limit switch/es.
Operating procedure