2 Components
Service manual
39
EBLQ+EDLQ011~016CAV3+W1 + EBLQ+EDLQ011~016CA3V3+W1
+ EK(2)CB07CAV3 + EKMBUHCA3V3+9W1
Daikin Altherma – Monobloc
ESIE18-04 – 2019.02
Is the measured voltage
correct?
Action
No Perform the next step of this
procedure.
4 Disconnect the 4‑way valve connector from the main PCB and
measure the voltage on the connector pins 1-3 of the connector
on the main PCB. The voltage MUST be 220~240VAC during
switching and 12VDC after switching.
Is the measured voltage on the
4‑way valve connector of the
main PCB correct?
Action
Yes Replace the 4‑way valve coil, see
"2.2.2Repair procedures"on
page39.
No Replace the main PCB, see
"2.17Main PCB"on page66.
5 Disconnect the 4‑way valve connector from the main PCB and
measure the resistance of the 4‑way valve coil. The resistance
MUST be 585Ω.
Is the measured resistance
correct?
Action
Yes Perform the next step of this
procedure.
No Replace the 4‑way valve coil, see
"2.2.2Repair procedures"on
page39.
6 De-activate Cooling and activate Heating operation via the user
interface.
7 Measure the temperature after the plate type heat exchanger.
Does the measured
temperature rise?
Action
Yes Perform a position check of the
4‑way valve, see "2.2.1Checking
procedures"on page38.
No Replace the main PCB, see
"2.17Main PCB"on page66.
To perform a position check of the 4-way valve
1 First perform a mechanical check of the 4‑way valve, see
"2.2.1Checking procedures"on page38.
2 Slide a magnet over the front and rear side of the 4‑way valve
body. The magnet MUST be attracted in the positions a or b,
but NOT in positions c.
a Magnet attracted
b Magnet attracted
c Magnet NOT attracted
Magnet is attracted in the
correct positions of the 4‑way
valve?
Action
Yes The 4‑way valve is OK. Return to
the troubleshooting of the
specific error and continue with
the next procedure.
No Replace the 4‑way valve body,
see "2.2.2Repair procedures"on
page39.
2.2.2 Repair procedures
To remove the 4-way valve coil
Prerequisite: Turn OFF the unit via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
Prerequisite: Remove the required plate work, see "2.19 Plate
work"on page77.
Prerequisite: If needed, remove any parts to create more space for
the removal of the 4‑way valve coil.
1 Remove the screw and remove the 4‑way valve coil from the
4‑way valve body.
a Screw
b 4‑way valve coil
c 4‑way valve body
2 Cut all tie straps that fix the 4‑way valve coil harness.
3 Disconnect the 4‑way valve coil connector from the main PCB.