EasyManua.ls Logo

Deka DURATION DD5300 - Module Unpacking and Handling

Deka DURATION DD5300
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DEKA DURATION DD5300
18
1.2 Module Unpacking and Handling
The battery is always delivered in WALL mode, and it is therefore necessary for the installer to make simple changes to
install the STACK kit. Below are the installation phases.
ATTENTION:
The battery must be lifted by four persons, using the four handles.
Two handles are built in and the other two are provided as temporary handles to be used as shown below.
Open the carton box, find the portable and retractable handles, position them and proceed with lifting.

Table of Contents

Related product manuals