EasyManua.ls Logo

Dell SC4020 - Page 57

Dell SC4020
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If an FC switch becomes unavailable, the storage system is accessed from the switch in the other fault
domain.
If a storage controller becomes unavailable, the virtual ports on the offline storage controller move to
the physical ports on the other storage controller.
Steps
1. Connect each server to both FC fabrics.
2. Connect fault domain 1 (shown in orange) to fabric 1.
Storage controller 1: port 1 to FC switch 1
Storage controller 1: port 3 to FC switch 1
Storage controller 2: port 1 to FC switch 1
Storage controller 2: port 3 to FC switch 1
3. Connect fault domain 2 (shown in blue) to fabric 2.
Storage controller 1: port 2 to FC switch 2
Storage controller 1: port 4 to FC switch 2
Storage controller 2: port 2 to FC switch 2
Storage controller 2: port 4 to FC switch 2
Example
Figure 45. Storage System in Virtual Port Mode with Dual 8 Gb Storage Controllers and Two FC Switches
1. Server 1 2. Server 2
3. FC switch 1 (fault domain 1) 4. FC switch 2 (fault domain 2)
5. Storage system 6. Storage controller 1
7. Storage controller 2
Next steps
Install or enable MPIO on the host servers.
NOTE: For the latest best practices, see the Dell Storage Center Best Practices document on the
Dell TechCenter site (http://en.community.dell.com/techcenter/storage/).
Connect the Front-End Cabling
57

Table of Contents

Other manuals for Dell SC4020

Related product manuals