EasyManua.ls Logo

Deutz 2012 - Other Preparations

Deutz 2012
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.1
Commissioning
3.1.3
Filii
Bleed Cooling System
2012:
In
accordance
with
the
radiator suppli-
er's specifications
Unit
engine:
In
accordance
with
the
radiator
supplier's specifications
3.1.4 Other Preparations
Check
battery
and
cable
connections,
see
6.7.1
.
Trial
run
-After
the
engine
has
been
prepared,
carry
out
abrief
trial
run
for
approx.
10
minutes,
without
load
if
possible.
During
and
after
the
trial
run
-
Check
the
engine for
leaks.
After
the
engine
has
been
turned
off
-
Check
oil
level
and
top
up
if
necessary,
see
6.1.2.
-
Retension
V-belts,
see
6.5.
Breaking
in
During
the
break-in
phase
-about
200
operat-
ing
hours - check
the
oil
level
twice
a
day.
After
the
engine
is
broken
in,
checking
once
a
day
will
be
sufficient.
In
the
event
of
commissioning
engines
which
have
been
preserved
Carry out
removal
of
preservation
in
accord-
ance
with
Chapter
8.1.
Engine
Operation
('I")
o
o
N
@

Related product manuals