EasyManua.ls Logo

dixell xweb 5000 - The Complete Project

dixell xweb 5000
115 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
dIXEL
Pag. 79 / 115
Fill in the ELS name”. The
user can create several
blocks then link together only
the ones he needs for the
current project. The other
blocks could be used in
different projects. In the
Available SDC” choose
Generator status”, then go
to “Available ODC” and
choose “Lights and blinds
and “Setpoint…”. Please
remember to add some brief
notes regarding what” the
project does. Press OK.
3.5.1.6 THE COMPLETE PROJECT
The complete project is shown in the main page by means of a graphical diagram:
“Note” button will display the brief description that the user filled in during the setup phase. When a SDC is
ON, the corresponding label DIS is in green colour. If all the conditions are met, the ELS forward the request

Table of Contents