EasyManua.ls Logo

Dover Petro Vend FSC3000 - Pedestal Mount DPC Kit Installation (FMS P;N 20-4419-DPC)

Dover Petro Vend FSC3000
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.1.7.2 Pedestal Mount DPC Kit Installation (FMS P/N 20-4419-DPC)
1. Install the DPC Interface Board.
l Remove the four (4) top 8-32 KEPS nuts from the top left set of studs of the Pedestal Board Plate.
l Align the 20-0612 board with the studs.
l Put the 8-32 KEPS nuts back on the studs and tighten them.
M1700 FSC3000 Installation Manual | Dover Fueling Solutions 55

Table of Contents

Related product manuals