EasyManua.ls Logo

Dover Petro Vend FSC3000 - 3.1.8 Install a DPC Interface for Gasboy

Dover Petro Vend FSC3000
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.1.8 Install a DPC Interface for Gasboy®
Part # Part Description Qty
51-0357 Universal Mounting Plate 1
50-0008 8-32 KEPS Nuts 4
75-2036 Isolated Converter (RS-232 to RS 422/485) 1
20-1519-04 RJ45 to DB9 Cable Assembly 1
07-3004 Power Supply 1
50-2144 1" x 1" Self-lock Adhesive Fasteners 4
20-1618 CABLE PCM MASTER 1
12-1015 Power Cable 1
3.1.8.1 Remote DPC Interface for Gasboy Installation
1. Attach the power supply (07-3004) and isolated converter (75-2036) to the mounting plate (51-0357)
with the four (4) 1-inch self-lock adhesive fasteners (50-2144).
2. Install the mounting plate with power supply and converter attached within 5' (1.52 m) of the FSC3000.
3. Plug the serial cable (P/N: 20-1519-04) into the isolated converter 9-pin port and then into Port 4 of the
FSC3000.
4. Install the pump communication wiring to the converter as shown in the illustration above.
M1700 FSC3000 Installation Manual | Dover Fueling Solutions 58

Table of Contents

Related product manuals