EasyManua.ls Logo

Duke FBB-EC-208 - Broiler Installation - Personnel and Delivery; Qualified Personnel

Duke FBB-EC-208
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Operation of Flexible Batch Broiler – Electric
6
II. INSTALLATION INSTRUCTIONS
A. QUALIFIED PERSONNEL
Theseinstallationinstructionsarefortheuseofqualied
installation and service personnel only.Installationor
servicebyotherthanqualiedpersonnelmayresultin
damage to the broiler and/or injury to the operator.
Qualiedinstallationpersonnelarethoseindividuals,rms,
companiesorcorporationswhicheitherinpersonorthrough
anagentisengagedinandresponsiblefor:
• Theinstallationofelectricalwiringfromtheelectric
meter, main control box or service outlet to the
electricalappliance.Qualiedinstallationpersonnel
must be familiar with all precautions required and
havecompliedwithallrequirementsofstateandlocal
authoritieshavingjurisdiction.See:NationalElectrical
Code,ANSI/NFPA70.
This appliance is not intended for use by persons
(includingchildren)withreducedphysical,sensory
or mental capabilities, or lack of experience and
knowledge,unlesstheyhavebeengivensupervision
orinstructionconcerninguseoftheappliancebya
personresponsiblefortheirsafety.
B. DELIVERY AND INSPECTION
DukeManufacturingCo.doeseverythingwithinitspower
toinsureyoureceivedyourbroileringoodcondition.They
arestrappeddownonheavywoodenskidsandpacked
topreventshippingdamage.Theyhaveallbeencarefully
inspectedbeforetheywerepackagedandconsignedto
the carrier.
UpondeliveryofyourDukebroiler:
• Lookovertheshippingcontainer,carefullynotingany
exteriordamageonthedeliveryreceipt,whichmust
alsobesignedbythedriver/deliveryperson.
• Unpackandcheckforanydamage,whichwasnot
evidentontheoutsideoftheshippingcontainer.
• Checkforconcealeddamage.Thecarriermustbe
notiedwithinfteen(15)daysofthedeliveryofthe
broilerandthecarton,skidandallpackagingmaterials
mustberetainedforinspection.
DukeManufacturingCo.cannotassumeliabilityforloss
ordamagesufferedintransit.Thecarrierassumesfull
responsibilityfordeliveryingoodorderwhentheshipment
wasaccepted.However,wearepreparedtoassistyou
inlingyourclaim.
Caution: The broiler is very heavy!
Use adequate help when lifting.
2
3
5
4
6
7
4
4
5
8
1) Usingautilityknife,cutawayplasticwrap(Notshown).
2) Remove the top cardboard and inner cap.
3) Remove Training Material Box
4) Removecardboardfromthecorners(4places).
5) Removecardboardontheends(2places).
6) Remove banding straps (Cut with utility knife or scissors:
5places).
7) Removeboxofattachableparts&accessoriesfromthefront.
8) Safelyliftoneendofbroilerandtapblocktowardscenterand
thensidewaystoremove.Repeatforremainingblocks.This
allowscasterstotouchthepallet.
9) Remove the broiler from the shipping pallet using 3 people
to guide and distribute it’sweight (approx 335 lbs[152 Kg])
accordingly.Whilecarefullysupportingthebroiler.Rollitforward
untilthefrontcastersareclearofthepallet.Liftthebroiler6-8
inchesaboveandawayfromthepallet,andgentlyplaceon
oortoavoiddamagetocasters.
10) Remove protective blue tape from broiler panels, double
checkingthatnotaperemains.

Related product manuals