5. OPERATION PROCEDURE
5.1 POWER UP SEQUENCE
5.1.2 Power-up Feeder and Stacker before UV coater
5.1.1 Fill up the Varnishing into UV Coating Bucket
The Heat Jacket Temp default is 45
, if ambient temperature is lower than 10
the Temp needs to set higher or wait 20 minutes to let coating get warm
5.1.2 Switch UV Valve to ON
UV Valve
Cleaning