EasyManua.ls Logo

EA UltraTEV Plus 2 - Maintenance

EA UltraTEV Plus 2
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2388-MANUL-V10.00.00-UTP2 Operating Manual
Page 66 of 74
5. Maintenance
Calibration
Calibration interval: 12 months
The calibration date and due date can be viewed through the About screen. A warning message will be
displayed on start up, when the UTP2 is past the calibration due date.
Cleaning and Storage
The UltraTEV
®
Plus
2
should be cleaned with a damp cloth. If more heavily soiled, a foam cleanser may be used,
provided care is taken not to allow fluid to enter the instrument. Abrasive cleaners must not be used. Take care
not to scratch the plastic overlay of the front panel.
No attempt should be made to gain access to the internal circuitry of the UltraTEV
®
Plus², or its accessories.
Advice should be sought from the manufacturer, or the supplier, if any doubt exists over the equipment's
performance or operation.
Avoid storage in damp and humid conditions and do not subject it to temperature extremes, excessive vibration
or shocks. Do not stand on the case of the UltraTEV
®
Plus².
Waste electrical and electronic equipment directive (WEEE)
EA Technology is a member of an approved compliance scheme as defined by the WEEE directive. When an
EA Technology product reaches the end of its operational life, it must be recycled by a licensed waste
management operator or returned to EA Technology for recycling.