5. Push
CALIBRATION
.
6. Push
EMPTY BLADDER
(1).
A pop-up box shows the text:
Store the
current position for 'empty bladder'. This
action is irreversible. Do you wish to
proceed?
7. Push
YES
.
A pop-up box shows. When the
procedure is done, it shows the text:
Calibration done
.
8. Push
OK
.
Final check and delivery to the customer
1. Make sure that all connections are correct. Refer to
Schematic diagrams
.
2. Make sure that all transits for cables, hydraulic hoses, wiring, etc. are carefully sealed.
Note: We recommend to put an anti-corrosive agent (e.g. tectyle) on the jacks,
including the hose connections.
3. Make sure that all functions operate correctly (automatic leveling, manual leveling, retract the
jacks).
4. Make sure that you give the customer the instruction manual.
5. Show all functions of the level system to the customer.