• On the original Panel, go to the position of the new loop you have just learned. In this
example it is loop3. Right click and select copy loop
• When the copy loop dialog box opens select the newly learned loop from the dropdown, from
the newly downloaded panel
• This adds the newly learned loop to the existing panel configuration
• Delete the second panel, (not the original). Add text descriptions, zoning & Cause and Effect
to the new loop as usual.
• Upload the config back to the panel & test.