OPERATION
NP-eVENT-16_10-2018 11
4. OPERATION
INSTALLATION AND FIRST OPERATION
Do not use the compressor immediately after unpacking as it will not
adjust to the ambient temperature.
Only qualified personnel can install the compressor and put it into
operation for the first time. The installer shall train the operating
personnel in the use and routine maintenance of the equipment.
Installation and training of personnel should be acknowledged by the
installer‘s signature on the installation certificate.
Prior to start-up, the four screws for transport stabilization must be
removed. If the compressor is switched on without removing the
stabilizers, the compressor could be permanently damaged!
The compressor does not contain a backup power supply.
This compressor can only be used with ventilators equipped with low
pressure alarms.
Never block the suction filter and the vent outlets on the lower part of
equipment. Never lift the unit by the handle! The handle is to be used to
move a compressor on the floor with the brakes released.
If the compressor is equipped with a main source of air, the standby air
source must be available.
ANY MODIFICATION OF THIS EQUIPMENT IS FORBIDDEN!
If this equipment is used nearby other instruments, the equipment must
be observed in order to verify normal operations in the configuration it
will be used.
Instruments may be affected electro-magnetically!
Preparing the compressor for use
After unpacking, place the compressor upright with the castor wheels firmly
on the ground.