EasyManua.ls Logo

EKOM DK50 D - Maintenance Schedule; Notice

EKOM DK50 D
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
NP-eVENT-16_10-2018 17
MAINTENANCE SCHEDULE
NOTICE
The operating entity is obliged to ensure that all tests of the equipment are carried
out repeatedly at least once within every 24 months (EN 62353) or in intervals as
specified by the applicable national legal regulations. A report must be prepared on
the results of the tests (e.g.: according to EN 62353, Annex G), including the
measurement methods used.
Maintenance range
Page
Time interval
To be
performed by
Clean suction filter
13
At least once a
week
Staff
Safety valve check
16
Once per year
Qualified expert
Replace filter (B)
16
Every 8000 hours
Qualified expert
Replace filter in
blow down filter (C)
16
Every 2000 hours
Qualified expert
Replace filter in the
pressure regulator
(D)
17
Every 2000 hours
Qualified expert
Test the tightness of
joints and inspect
the equipment
Service
documentation
After two years
Qualified expert
Replace piston
complete with piston
rings, O-rings and
bearing
Service
documentation
Every 4000 hours
Qualified expert
Bearing
replacement
Service
documentation
Every 4000 hours
Qualified expert
Perform “Repeated
Test” according to
EN 62353
15
1 x 2 years
Qualified expert

Table of Contents

Other manuals for EKOM DK50 D

Related product manuals